19 November 2020 / COVID-19

Keeping COVIDSafe [Reminder]

Reminder to be vigilant

In light of the latest coronavirus cluster that has developed in South Australia, this update is a reminder to everyone to remain vigilant and not become complacent in the fight against COVID-19.

We must continue to listen to the health advice in each State and maintain the various measures we have put in place to help keep everyone safe and prevent the spread of the virus.

From midnight last night, South Australia starts a 6-day lockdown period. This includes the closure of the local construction industry. These new restrictions are the result of an outbreak in the state where they hadn’t seen any cases of community transmission for seven months.

Each person’s individual effort contributes to keeping case numbers low, particularly given that outbreaks are likely to continue in Australia until a vaccine is available.

Part of our collective responsibility is ensuring that we each recognise coronavirus symptoms and get tested if we experience any of these (listed below). 

Other Recent Activities

View all activities
30 October / Quality Alert

Engineered stone ban effective 1 July 2024

ALL engineered stone regardless of the silica content percentage will be banned


Alternative products must be considered and implemented on all projects.

The industry is shifting away from engineered stone due to the risks of respirable crystalline silica, which can cause silicosis and other silica-related diseases. Although the consultations are under way and there has been no official announcement by Federal or State Governments on the issue, the health and safety risks along with the uncertainty around this issue warrants a decision to ban all engineered products entering job sites nationally. The ban will take effect on 1 July 2024 and will extend to ALL engineered stone regardless of the silica content percentage. 

An update to this alert will be provided before the end of the year when the Federal and State Governments are expected to issue a formal decision on the ban. In the meantime, to mitigate the impact of potential delays and variations, the best approach is to inform the clients of the pending ban and to propose and seek approval for an alternative product. Similarly, ensure all future estimates have the stone specification qualified and priced accordingly.

Product alternatives going forward include:

Compact Laminates

  • Under 1% silica content
  • Extremely competitive pricing
  • Only comes in 12mm thickness
  • Heat resistance is an issue
  • Product not suitable for high end applications

Porcelain Surfaces

  • Under 10% silica content
  • Price dependant of product and supplier
  • Large variety of colours and thicknesses (4, 8, 12, 20 and 30mm)
  • Great resistance to staining, scratches, UV and heat
  • Good warranty terms

Acrylic Solid Surfaces

  • 0% silica content
  • More expensive alternative
  • Limited thickness availability
  • UV stable and heat resistant but direct heat exposure not advised
  • Minimising wastage through flexibility in sheet sizing
  • Seamless joints

Natural Stone*

  • Various silica content percentages
  • Variety of products at different price points available
  • Ongoing maintenance may be an issue
  • Unlikely to satisfy specific warranty requirements

*Although this alert does not directly impact natural stone, some types have high silica content so risk of using these on projects should be considered carefully.

For an up-to-date list of available products and their usability, click here.


More information

If you need additional support, please contact the Quality Team:

Phone 1300 HUTCHIES
Email QualityTeam@hutchinsonbuilders.com.au

View More
10 October / Update

Make sure bin chute systems are installed correctly, following the tested systems and the manufacturers’ instructions.

Check the detailed drawings from Elephant’s Foot and Wastech for different wall types (plasterboard, shaft-liner, speed panel, concrete, Hebel, and masonry).

Any changes to the tested systems must be approved by your project certifier, signed off by the fire engineer in the fire engineering report (FER), and accepted by the relevant state / territory fire service.