16 March 2023 / Quality Alert

New building forms are now available

Building forms 12, 15, 16, 17 and 18 have been amended by the Queensland Department of Energy and Public Works.

The new, updated forms can be downloaded now and must be used from 1 May 2023.

You can immediately start using the new updated Forms 12, 15, 16, 17 & 18. The new forms can be downloaded here.

Prior versions of these forms signed before 1 May 2023 remain valid and can still be accepted by a building certifier, builder, competent person or owner. However, you should now use the new forms where possible. 

Please also be aware of the new (non-mandatory) Form 73 - Product Technical Statement available.

For more information, read the bulletin

You can find out more about the changes to the building forms in the Queensland Government's Building and Plumbing Newsflash 614.

You can also access and start using the new forms straight away. Simply go to the website here and navigate to the relevant form in the list, which were updated as of 10 March 2023.

Other Recent Activities

View all activities
30 October / Quality Alert

Engineered stone ban effective 1 July 2024

ALL engineered stone regardless of the silica content percentage will be banned


Alternative products must be considered and implemented on all projects.

The industry is shifting away from engineered stone due to the risks of respirable crystalline silica, which can cause silicosis and other silica-related diseases. Although the consultations are under way and there has been no official announcement by Federal or State Governments on the issue, the health and safety risks along with the uncertainty around this issue warrants a decision to ban all engineered products entering job sites nationally. The ban will take effect on 1 July 2024 and will extend to ALL engineered stone regardless of the silica content percentage. 

An update to this alert will be provided before the end of the year when the Federal and State Governments are expected to issue a formal decision on the ban. In the meantime, to mitigate the impact of potential delays and variations, the best approach is to inform the clients of the pending ban and to propose and seek approval for an alternative product. Similarly, ensure all future estimates have the stone specification qualified and priced accordingly.

Product alternatives going forward include:

Compact Laminates

  • Under 1% silica content
  • Extremely competitive pricing
  • Only comes in 12mm thickness
  • Heat resistance is an issue
  • Product not suitable for high end applications

Porcelain Surfaces

  • Under 10% silica content
  • Price dependant of product and supplier
  • Large variety of colours and thicknesses (4, 8, 12, 20 and 30mm)
  • Great resistance to staining, scratches, UV and heat
  • Good warranty terms

Acrylic Solid Surfaces

  • 0% silica content
  • More expensive alternative
  • Limited thickness availability
  • UV stable and heat resistant but direct heat exposure not advised
  • Minimising wastage through flexibility in sheet sizing
  • Seamless joints

Natural Stone*

  • Various silica content percentages
  • Variety of products at different price points available
  • Ongoing maintenance may be an issue
  • Unlikely to satisfy specific warranty requirements

*Although this alert does not directly impact natural stone, some types have high silica content so risk of using these on projects should be considered carefully.

For an up-to-date list of available products and their usability, click here.


More information

If you need additional support, please contact the Quality Team:

Phone 1300 HUTCHIES
Email QualityTeam@hutchinsonbuilders.com.au

View More
10 October / Update

Make sure bin chute systems are installed correctly, following the tested systems and the manufacturers’ instructions.

Check the detailed drawings from Elephant’s Foot and Wastech for different wall types (plasterboard, shaft-liner, speed panel, concrete, Hebel, and masonry).

Any changes to the tested systems must be approved by your project certifier, signed off by the fire engineer in the fire engineering report (FER), and accepted by the relevant state / territory fire service.

View More